Industrial Cases
Industrial projects in which we've been involved have ranged from a mobile access and maintenance gantry system for London Heathrow’s Terminal 5, to a special mast system for offshore use. Whatever the challenge, Prolyte Group are ready to rise to the occasion.
|
|
A company specialized in CPT (Cone Penetration Testing) systems for the offshore industry were looking for an application of truss techniques in one of their CPT systems – the Rosen - and felt that the Prolyte Group would be an excellent partner. |
|
|
Prior to its imminent completion, Terminal 5 at Heathrow had been the largest construction site in Europe, the main terminal building alone being some 400m long by 175m wide. Height was also an important feature in the overall design.
|